Description: |
Cars are parked along the north side of the East Mall, outside of Lilly Hall (left) and Clowes Memorial Hall (right). The construction of Clowes Hall began on August 15, 1960, and the general contractor was the George Bahre Company, while the construction of Lilly Hall began in April 1961, with the J.L. Simmons Company, Inc. as the general contractor. As both buildings were under construction at the same time, some issues occurred between the contractors, who competed for open space around the two projects. Lilly Hall opened in September 1962, while Clowes Hall opened in October 1963. A cropping mark is located on the right side of the photograph. |
---|---|
Source: |
http://palni.contentdm.oclc.org/cdm/ref/collection/BldgsGrnds/id/2443 |
Collection: |
Butler University Buildings and Grounds Collection |
Rights: | http://rightsstatements.org/vocab/InC-EDU/1.0/ |
Copyright: |
In Copyright - Educational Use Permitted |
Geography: |
Indianapolis, Indiana, United States, 39.839229, -86.170312 39.839229 -86.170312 |
Subjects: |
Clowes Memorial Hall Arts facilities Art centers Auditoriums Centers for the performing arts Music-halls Music facilities Theaters Balconies Streets Sidewalks Trees Shrubs Automobiles Butler University--Buildings College buildings Butler University--History Indianapolis (Ind.)--History Lilly Hall East Mall 46th Street Butler Way Bushes Fairview campus |
Further information on this record can be found at its source.