Bloomington High School North, Nikean, 2004, Page 5

Description: and the walls of BHSN!Blueprints for the rennovationsincluded a new entrance withAtrium. Art, Orchestra andBand would get room additions. The library and all of theacademic wings would beenhanced also.Alterations to the libraryinclude, a new entrance andmore space. The library wasclosed prior to school ending toenable everyone to pack up orcover to avoid the constructiondust.Assistant Principal, Mr. Marcus Debro, assistswith the clean-up in the office hallway after abeam broke through a glass panel. Studentsfrom vaious organizations painted the glasspanels to enhance the hallway. The black paintwas the workers chose was not acceptable.As the front entrance began going up,everyone became anxious to see whatthe school would look like when it wasall finished. During the constructionthough it was all just annoying,because it was so difficult to manueveraround the building.Got glue!!! The construciton workersbecame a part of the everyday sceneryin every section of the building. Theirnames werent known, but their faceswere recognized, and the job theywere doing appreciated.
Source: http://cdm17129.contentdm.oclc.org/cdm/ref/collection/hs-bloomnorth/id/5439
Collection: Bloomington High School North

Further information on this record can be found at its source.